Łukasz Głazik
SUCCESSFULLY ENTERED ATTACK PHASE
Doug Robbins
Vice President
Engineering and Prototyping MITRE
Issue date:
2026-04-24
Doug Robbins
2026 MITRE Embedded Capture the Flag
Distributed by:
UGA

Issued to

Łukasz Głazik

Want to report a typo or a mistake?

ORDER

Credential Verification

Issue date: April 24, 2026

ID: e2a427f9-0a57-4826-a611-d2112d86ce1f

MITRE logo

Issued by

MITRE

Verified

Description

Congratulations to the holder of this certificate, whose team successfully submitted a design and entered the Attack Phase of the 2026 MITRE Embedded Capture the Flag competition.