Gil Orea Amador
SUCCESSFULLY ENTERED ATTACK PHASE
Doug Robbins
Vice President
Engineering and Prototyping MITRE
Issue date:
2026-04-24
Doug Robbins
2026 MITRE Embedded Capture the Flag
Distributed by:
GOA

Issued to

Gil Orea Amador

Want to report a typo or a mistake?

ORDER

Credential Verification

Issue date: April 24, 2026

ID: 70c2b482-5416-4474-81b9-fd8b3b2ac6c9

MITRE logo

Issued by

MITRE

Verified

Description

Congratulations to the holder of this certificate, whose team successfully submitted a design and entered the Attack Phase of the 2026 MITRE Embedded Capture the Flag competition.