William Coleman
SUCCESSFULLY ENTERED ATTACK PHASE
Doug Robbins
Vice President
Engineering and Prototyping MITRE
Issue date:
2025-04-25
Doug Robbins
2025 MITRE Embedded Capture the Flag

Distributed by:

Issued to

William Coleman

Want to report a typo or a mistake?

Credential Verification

Issue date: April 25, 2025

ID: 5b9adc9c-e237-4cb4-9ae4-5832dad3ae6e

Issued by

VERIFIED

MITRE

Description

Congratulations to the holder of this certificate, whose team successfully submitted a design and entered the Attack Phase of the 2025 MITRE Embedded Capture the Flag competition.