Seth Hyslop
SUCCESSFULLY ENTERED ATTACK PHASE
Doug Robbins
Vice President
Engineering and Prototyping MITRE
Issue date:
2026-04-24
Doug Robbins
2026 MITRE Embedded Capture the Flag

Distributed by:

Issued to

Seth Hyslop

Want to report a typo or a mistake?

Credential Verification

Issue date: April 24, 2026

ID: 3f239284-2710-463a-ba03-8ba0d35629d0

MITRE logo

Issued by

VERIFIED

MITRE

VERIFIED

Description

Congratulations to the holder of this certificate, whose team successfully submitted a design and entered the Attack Phase of the 2026 MITRE Embedded Capture the Flag competition.