Daniel Gao
SUCCESSFULLY ENTERED ATTACK PHASE
Doug Robbins
Vice President
Engineering and Prototyping MITRE
Issue date:
2025-04-25
Doug Robbins
2025 MITRE Embedded Capture the Flag
Distributed by:
DG

Issued to

Daniel Gao

Want to report a typo or a mistake?

ORDER

Credential Verification

Issue date: April 25, 2025

ID: 285af3fd-24a6-4996-b92b-c15b64e66f7f

MITRE logo

Issued by

MITRE

Verified

Description

Congratulations to the holder of this certificate, whose team successfully submitted a design and entered the Attack Phase of the 2025 MITRE Embedded Capture the Flag competition.