Riley Owen
SUCCESSFULLY ENTERED ATTACK PHASE
Doug Robbins
Vice President
Engineering and Prototyping MITRE
Issue date:
2026-04-24
Doug Robbins
2026 MITRE Embedded Capture the Flag
Distributed by:
RO

Issued to

Riley Owen

Want to report a typo or a mistake?

ORDER

Credential Verification

Issue date: April 24, 2026

ID: 118f5553-a80e-4a09-b0bf-f6a5e3d96c75

MITRE logo

Issued by

MITRE

Verified

Description

Congratulations to the holder of this certificate, whose team successfully submitted a design and entered the Attack Phase of the 2026 MITRE Embedded Capture the Flag competition.