Paul Johnson
SUCCESSFULLY ENTERED ATTACK PHASE
Doug Robbins
Vice President
Engineering and Prototyping MITRE
Laurie Giandomenico
Director
MITRE Engenuity
Issue date:
2024-05-02
Doug Robbins
Laurie Giandomenico
2024 MITRE Engenuity Embedded Capture the Flag

Distributed by:

Issued to

Paul Johnson

Want to report a typo or a mistake?

Credential Verification

Issue date: May 2, 2024

ID: 0c5fce11-9ef7-4654-b090-4f218fd7a099

MITRE logo

Issued by

VERIFIED

MITRE

Description

Congratulations to the holder of this certificate, whose team successfully submitted a secure design for a medical device, and who successfully entered the Attack Phase of the 2024 MITRE Embedded Capture the Flag competition.